A gritting contract should say which areas are treated, marked on a plan; the forecast threshold that starts a run; the time by which treatment must be finished; what happens when rain or snow follows a run; what salt is spread; who keeps the grit bins full; what each visit record contains; and how the season and the price work. Anything left out gets decided on the night.
This is for the facilities, site or estate manager about to sign or renew winter cover. How gritting works in general is in the guide to how commercial gritting works, and whether you have to grit at all is in Do businesses have to grit their car park? This article goes through the contract one clause at a time: what each should say, and what goes wrong when it is vague.
What this article covers
- The areas, marked on a plan
- The trigger: a number and a forecast
- The time-by
- Repeat runs: rain, snow and a second freeze
- Snow: when clearing starts and where it goes
- Salt and grit bins
- Records: what you receive, and when
- Access, contacts and insurance
- Season and price
- Questions to ask before you sign
The areas, marked on a plan
The contract should include a site plan with every surface to be treated marked on it, agreed after a walk of the site. A written list is where the arguments start. “Car park” can mean the bays, the bays and the footpaths between them, or everything inside the barrier, and the person spreading the salt at six in the morning will pick one.
The places that most often fall off a plan are the ones people use without thinking about them: the walking route from the car park to the door, the steps at a side entrance, the path to the bin store, the corner that never sees the sun. The Health and Safety Executive’s list of where ice forms includes shortcuts and areas constantly in the shade or wet, and both are easy to miss from an office.
If a route is deliberately left out, the contract should say so, and staff should be told. HSE’s advice is to let employees know where you will focus your efforts.
The trigger: a number and a forecast
The trigger clause should give a number, say what it is measured on, and name the forecast it is read from. “Gritting as required” is not a trigger. It hands the decision to whoever is on shift, on the night it matters.
Thresholds are set on either forecast road surface temperature or forecast air temperature, and the gritting guide explains why the two differ. For the contract, what matters is that the number is written down. Airwaves grits whenever the forecast air temperature is 2°C or below.
Three more lines belong in this clause:
- Whose forecast, and for where. The forecast for your site, from a source both sides can check afterwards.
- Who decides on a marginal night. If the forecast sits right on the threshold, does the contractor go anyway, or ring you first?
- Runs you call yourself. Whether you can ask for a run outside the trigger, for an early event or a forecast you don’t trust, and how it is charged.
The time-by
The time-by is the clock time by which every agreed area must be treated. Set it from when the first people arrive. That is often well before the official opening time, once cleaners, early shifts and deliveries are counted.
HSE suggests gritting in the early evening, before frost has settled, or in the early morning ahead of staff arriving, and points out that salt takes time to dissolve before it does anything. So the time-by should leave room for the salt to work, and the contract should say whether runs go out in the evening, the early morning, or both.
Sites that never close, such as hospitals and distribution centres, need a different version: which areas are treated first, and the latest time each must be done.
Repeat runs: rain, snow and a second freeze
The contract should say what starts a second run in the same cold spell, and how it is charged. The trigger clause covers the first run. Several things can undo it.
- Rain. HSE warns that heavy rain washes salt away, which matters if the rain then turns to snow.
- Snow on treated ground. Salt can melt some snow, but settled snow needs clearing. See the next section.
- A thaw and a refreeze. A day above freezing followed by a hard night leaves meltwater on the surface to freeze again.
None of these is unusual in a British winter. If the contract only describes the first run, the second becomes a phone call and a negotiation, at the moment there is least time for either.
Snow: when clearing starts and where it goes
A gritting trigger says nothing about snow. HSE says grit does little once snow has been packed down into ice, so the contract needs a snow clause of its own.
It should cover:
- What starts clearance. A depth, or simply snow settling on the treated areas.
- Which areas come first. Agree the order, so the routes everyone has to use are cleared before the rest.
- How it is cleared. By machine where a machine can get in, and by hand where it cannot.
- Where the snow goes. Taken off site, or piled to melt, and if piled, exactly where. Mark the pile locations on the same site plan, away from bays and routes people need.
- How it is charged. Whether snow clearance is in the seasonal price or charged separately.
Salt and grit bins
The salt clause should name what is spread (white rock salt, brown rock salt or treated salt), who supplies it, and where the stock is held. A contract that says salt will be spread “subject to availability” has told you what happens in a cold snap, when every merchant runs low at once. Ask how much the contractor holds before the season starts.
If you have surfaces that need care, such as new block paving or planting beside a path, write that into the clause.
Grit bins need their own lines: how many, where (on the plan), who fills them, and when they are checked. “Checked on every gritting visit” is a clause. “Refilled when needed” leaves the bin to be found empty by the person who needed it.
Records: what you receive, and when
The contract should say what each visit record contains, how you receive it, how soon, and how long it is kept. Airwaves logs the time, photos, the areas treated and a sign-off for every visit, and that is a fair minimum to ask any contractor for.
The record matters because of the law on contractors. Under section 2(4)(b) of the Occupiers’ Liability Act 1957, an occupier is not automatically answerable for a contractor’s faulty work if it chose the contractor reasonably and took reasonable steps to check the work had been done properly. The article on the law quotes the provision in full. Checking the work means seeing the record.
So write down when the record arrives (by the start of the working day is a reasonable ask), in what form, and for how long the contractor keeps it. A claim can arrive long after anyone remembers which night it was.

Access, contacts and insurance
Access. Keys, barrier codes, gate times and alarm arrangements, written down, with a named person responsible for keeping them current. A contractor who arrives at 5am to a locked barrier has treated nothing, and the record will show it.
Contacts. A named contact on each side, with an out-of-hours number for both. The contract should also say what happens if a run cannot go ahead, and how quickly you are told.
Insurance and competence. Ask for the contractor’s public liability insurance certificate and evidence of competence, such as accreditations from schemes that assess health and safety. The same section of the 1957 Act looks at whether an occupier took reasonable steps to check the contractor was competent, so keep what you are given with the contract.
Season and price
Season. Start and end dates, and what happens to frost outside them. Frost does not always keep to the season dates. The contract should say whether those nights are covered, charged as extras, or not covered at all.
Price. Gritting is usually priced in one of two ways: a fixed fee for the season, or a charge per visit. Whichever is used, the contract should define what a visit is (one run across every agreed area, or any attendance at all), and say how repeat runs, runs you call yourself and snow clearance are charged. With a seasonal fee, ask whether it covers every run the trigger produces, or a set number.
Neither basis is better in general. A seasonal fee fixes the cost in advance. Per visit, a mild winter costs less and a hard one costs more. What matters is that both sides read the clause the same way in February.
Questions to ask before you sign
- Is every area marked on a plan we have both signed?
- What is the trigger, measured on what, from whose forecast?
- What is the time-by for each part of the site?
- What starts a second run in the same night or the same cold spell?
- What starts snow clearance, and where does the snow go?
- What salt is spread, and how much stock do you hold now?
- Who fills the grit bins, and when are they checked?
- What does each visit record contain, and when will I receive it?
- How long do you keep the records?
- Who do I call at 5am, and who calls me if a run cannot go ahead?
- Can I see your public liability certificate and accreditations?
- What are the season dates, what counts as a visit, and how is each kind of run charged?
A contractor who answers all twelve without hesitating has probably been asked them before.
How Airwaves writes a gritting contract
A commercial gritting and snow clearance contract with Airwaves Facilities Management starts with the areas: recommended by us, decided by you, and agreed before the contract starts. The trigger is written down as a run whenever the forecast air temperature is 2°C or below, finished before the site opens. The salt is whatever your specification names, from 50 pallets held at our base in Berkswell. Grit bins are supplied, placed and kept topped up by us. Snow is cleared by machine, or by hand where a machine cannot get in, and taken off site or piled where you have agreed.
Every visit is logged with the time, photos, the areas treated and a sign-off. Contracts usually run for a set winter season, priced per season or per visit, either on their own or alongside a grounds maintenance contract so one team and one point of contact look after the site all year. We hold public liability insurance, and our accreditations are published on the site.
The short version
- Put the areas on a plan, and the trigger, the time-by and the repeat runs in numbers.
- Say who supplies the salt, who fills the bins, and where the snow goes.
- Say what each record contains, when it arrives and how long it is kept, and define what a visit costs.
The clause nobody wrote is the one everybody argues about.
Ask about winter cover. Send us the address and what you need treated, and we will come back with a quote.