Skip to content
An Airwaves Facilities Management van and a tractor parked at a building entrance after snowfall, with the entrance road cleared.

Commercial gritting: how winter cover works

What triggers a gritting run, what gets treated, what is spread, how snow is cleared, what a visit record shows, and what to put in the contract.

Commercial gritting is the treatment of a site’s car parks, access routes, footpaths and entrances with rock salt before frost, ice or snow forms. On a contract, a forecast trigger decides each run, the areas are agreed in advance, the run goes out before the site opens, and every visit is recorded. Snow clearance and grit bins sit alongside it.

This guide is for the person who has to make a commercial site, a school, a hospital or a managed residential estate safe to walk into on a January morning. It covers how the work runs, from the forecast to the record. Whether you have to grit at all, and what the law expects of an occupier, is covered in Do businesses have to grit their car park?

What this guide covers

What triggers a gritting run

A forecast. On a gritting contract, a run goes out when the forecast crosses a threshold written into the specification. Nobody at the site has to notice the frost and ring.

The Health and Safety Executive’s guidance on slips in icy conditions sets the general rule: “Gritting should be carried out when frost, ice or snow is forecast or when walkways are likely to be damp or wet and the floor temperatures are at, or below, freezing.”

Two kinds of threshold are in use. Highway authorities work from the forecast temperature of the road surface. Nottinghamshire County Council, for example, says its gritters “go out when forecasts suggest road temperatures will be at 0 degrees or below and moisture will be present to form ice”, and adds that “road temperatures are often lower than air temperatures”, particularly in shaded spots and on roads with fewer vehicles. Site contractors more often work from the forecast air temperature, because that is what a standard forecast gives. Airwaves Facilities Management grits whenever the forecast air temperature is 2°C or below. A threshold set above freezing allows for the surface being colder than the air above it.

The forecast matters more than the view from the window. HSE notes that “‘dawn frost’ can occur on dry surfaces, when early morning dew forms and freezes on impact with the cold surface”, and that “it can be difficult to predict when or where this condition will occur”. A site that waits to see ice before acting will sometimes see it under the first person to arrive.

Whatever the threshold, it needs to be in writing. The contract and the visit record are how an occupier later shows it took reasonable care, which is the point the article on the law turns on.

What gets treated

The areas are agreed before the contract starts, from a walk of the site. The contractor recommends which surfaces should be treated, the client decides, and the list goes into the specification, marked on a plan.

HSE’s list of where ice forms is the starting point: “building entrances, car parks, pedestrian walkways, shortcuts, sloped areas and areas constantly in the shade or wet”. The shortcut across the verge matters as much as the signed route, because it is where people actually walk.

On most sites the areas fall into four groups:

  • Car parks. Bays, aisles and the walking routes between them, where cars and people cross the same frozen surface.
  • Access routes. The private roads and routes into and around the site, so staff can get in and deliveries can get through.
  • Footpaths and entrances. The paths and building entrances everyone on foot has to use, which HSE puts at the top of its list.
  • Grit bins. Placed where people can treat a short stretch themselves between visits. More on these below.

If part of the site is left out, say so. HSE’s advice is plain: “If you can’t tackle some paths regularly, let your employees know where you will focus your efforts.” A route people assume is treated and isn’t is worse than one they know to avoid.

A tractor with a front-mounted snow plough working through a large, snow-covered car park at night under floodlights
Clearing a car park at night. Car parks, access routes and entrances are agreed before the contract starts. Photo: Airwaves Facilities Management.

When the run goes out

Before people arrive. The specification sets a time-by, the time by which treatment must be finished, and HSE puts it this way: “The best times are early in evening before the frost settles and/or early in the morning before employees arrive.”

The reason is that salt needs time. HSE again: “Salt doesn’t work instantly; it needs sufficient time to dissolve into the moisture on the floor.” A car park treated as the first cars pull in has been treated too late for the people in them. Airwaves runs go out early as standard, so the site is treated before it opens.

Rain complicates the timing. HSE warns that “if you grit when it is raining heavily, the salt will be washed away, causing a problem if the rain then turns to snow”. A contractor planning a run is watching the forecast for rain as well as temperature, and the time-by is what every run is planned back from.

What is spread

Rock salt, in one of three forms, to the client’s specification.

HSE: “Rock salt (plain and treated) is the most commonly used ‘grit’.” It works on the moisture already on the surface: “Salt can stop ice forming and cause existing ice or snow to melt.”

The three forms in general use are white rock salt, brown rock salt and treated salt. A specification will usually name one. Airwaves spreads whichever the client’s specification calls for. Which form suits which surface, and what salt does to block paving and planting over a winter, is a subject of its own.

Stock is the practical question. Highway authorities stockpile before winter: Nottinghamshire says it holds “17,500 tonnes of salt at the start of winter”. A site contractor has to do the same on its own scale, because the cold snap is when every merchant’s yard empties at once. Airwaves keeps 50 pallets at its base in Berkswell. When choosing a contractor, ask what they hold, as well as what they spread.

Salt has a limit. Nottinghamshire notes that “at temperatures below minus 5 degrees the effectiveness of the salt is reduced”. In a hard freeze, treated areas can still ice over, which is one more reason the areas and the timing matter more than the quantity.

Grit bins between visits

Grit bins cover the gaps between runs and the spots a vehicle cannot reach: steps, a narrow path, the stretch outside a side door.

The council’s yellow bins are not for this. The government’s guidance on clearing snow and ice says “do not use the salt from salting bins as this is used to keep roads clear”. A site needs its own.

Placement follows the same list as treatment: entrances, steps, slopes, and anywhere a short stretch ices regularly. The same guidance adds: “pay extra attention when clearing steps and steep pathways - using more salt may help.”

On a contract, bins are supplied, put where they are needed and kept topped up, so there is salt to hand between visits. Someone has to own the refilling. A bin that was full in November and empty in January is the usual failure, and it is only found out when it is needed.

When it snows

Salt alone will not shift settled snow. HSE: “Compacted snow, which turns to ice, is difficult to treat effectively with grit.” Once snow has been driven and walked on, it has to be cleared, and the sooner the better.

The government’s guidance gives two rules that hold on any site: “do it early in the day - it’s easier to move fresh, loose snow”, and “do not use water - it might refreeze and turn to black ice”.

Airwaves clears snow by machine where a machine can get in, and by hand in the tighter areas where it cannot. Cleared snow is either taken off site or piled up to melt. Where it is piled should be agreed in advance, because a pile in the wrong place blocks a bay or a route for a week.

A tractor with a front-mounted snow plough clearing a car park in heavy falling snow at night
Snow is cleared by machine where a machine can get in, and by hand where it cannot. Photo: Airwaves Facilities Management.

What a visit record contains, and why

The time, photos, the areas treated and a sign-off, every visit. That is what Airwaves logs, and it is what any contractor should be able to produce.

The record is the evidence. If someone slips in the car park on a Tuesday morning, the questions are whether the site was treated on Monday night, when, and where. A log answers them in a minute. A conversation six months later does not. An occupier who chose a competent contractor and took reasonable steps to check the work was done is in a far better position than one who can show neither, a point the article on occupiers’ liability sets out in full.

A test when choosing a contractor: can they send you last night’s record for your site by the time you reach your desk? If not, the work may well have happened, and you still cannot show it.

In-house or a contractor

Both work, and plenty of sites do it themselves. In-house needs four things in place before the first frost:

  1. Grit bins and a stock of salt, bought before the cold snap rather than during it.
  2. A named person who arrives before everyone else, and a second name for when the first is away.
  3. A way of spreading it. A shovel covers a path. A car park needs a spreader.
  4. A record of each treatment, kept somewhere it will be found.

A contractor needs to show four things of its own: a written scope, a trigger, a time-by, and records. Then there is capacity, which is the one people forget. One cold night hits every site in a region at once, so the question is how many sites a contractor can treat before opening time. In the winter of 2025 to 2026, Airwaves gritted 145 sites in a single night. Ask any contractor for their equivalent figure.

Experience, equipment, salt supply, a local base and accreditations are the usual things to check, and all of them are worth checking. Add the four above and the capacity question, because they are what decide whether the site is safe at eight in the morning.

How gritting is bought and priced

Usually as a set winter season, agreed before the first frost, and priced either as a fixed fee for the season or per visit.

A seasonal fee is a fixed price for the season, so the cost is known in advance. Per visit, each run is charged as it happens, so a mild winter costs less and a hard one costs more. Which suits a site is a budgeting choice, so ask for both.

What drives the price is the areas agreed and the number of visits a winter produces, so there is no useful figure without a site plan. Any contractor will quote from the areas in the specification.

Gritting can be bought on its own for the winter, or added to a grounds maintenance contract so the same team covers the site all year. The second option means the team does not go quiet in November, which is the month the site starts to get dangerous.

What to put in writing

Whichever way it is bought, these are the things that need to be in the contract:

ItemWhat to write down
AreasWhich car parks, routes, paths and entrances, marked on a plan
TriggerThe forecast threshold that starts a run
Time-byWhen treatment must be finished, usually before opening
SaltWhite, brown or treated, and who supplies it
Grit binsHow many, where, and who refills them
SnowHow it is cleared and where it goes
RecordsWhat each visit log contains and when you receive it
SeasonStart and end dates
PricePer season or per visit

The clause-by-clause version, with the questions to ask before you sign, is in What a gritting contract should say.

How Airwaves runs winter cover

Airwaves Facilities Management provides commercial gritting and snow clearance across the UK, on winter-only contracts or as part of a grounds maintenance contract. Sites include hospitals, railway stations, police and fire stations, universities, Merry Hill shopping centre, and Tesla, Amazon and HS2 sites.

Runs go out whenever the forecast air temperature is 2°C or below, before the site opens. Salt is spread to the client’s specification from stock held at Berkswell, grit bins are supplied and kept topped up, snow is cleared by machine and by hand, and every visit is logged with the time, photos, the areas treated and a sign-off. One contract, one point of contact, all year.

The short version

  • The forecast decides. A written trigger starts the run, and the run finishes before people arrive.
  • The areas, the time-by, the salt, the bins and the snow are agreed in writing before the first frost.
  • Every visit is recorded. A site that was treated and cannot show it is in the same position as one that was never treated.

The first frost is forecast every year. The contract should be signed before it.

Ask about winter cover before the first frost.


Ready to talk facilities management?

Get in touch with our team for a total FM solution tailored to your requirements.