Stagecoach Oxford, Refurbishment Works
Refurbishment of 2 storey offices & renovation of 2 maintenance hangars
Airwaves FM redecorated 19 internal office rooms, with all ceiling tiles and carpet tiles renewed across the multi-use office and welfare space. The kitchen was also fully renewed with fit-for-purpose units and appliances.
Following the redecoration of the adjacent offices, the Airwaves FM projects team renovated 2 maintenance hangars on the site. Perimeter walls were deep cleaned using a sky vac system, removing all dirt and debris, then redecorated in a 2 tone paint finish.
All woodwork and interior doors were redecorated across a split level space including a mezzanine. The maintenance hangar floors totalling 1,200m² were then steam cleaned using the Tensid Torik stone cleaning system and degreased. A final finish was applied consisting of two-pack epoxy resin floor covering, denoting hazard areas.
Ready to talk facilities management?
Get in touch with our team for a total FM solution tailored to your requirements.