Levi’s, Bullring
Glazing Removal

Glazing removal at Levi’s store, Bullring Birmingham

Airwaves FM responded to an emergency call out at Levi’s, Bullring to make safe failed glazing unit on the shop front.

Location

Birmingham City Centre

Duration

June 2024 - 2 night shifts

Value

£27,000.00

Levi’s, Bullring - Glazing Removal

Glazing removal at Levi’s store, Bullring Birmingham

Airwaves FM responded to an emergency call out at Levi’s, Bullring to make safe failed glazing unit on the shop front. Due to store opening hours, an Out of Hours team was deployed that Sunday evening to mitigate further risk to the shopping centre and its customers. The team erected an 8m aluminium scaffold tower and installed protective laminate film to the entire glazing unit. A return visit was scheduled to remove the glazing unit. An exclusion zone was built with all protective hoarding and flooring installed. The main shop signage was isolated and removed using scissor lift. The glazing unit was removed using a BG 250 articulated spider crane with 635kg vacuum lifter attachment. On removal, a clear screen was installed allowing the store to continue trading the following day.

Our Gallery