Levi’s, Bullring
Glazing Removal

Glazing removal at Levi’s store, Bullring Birmingham
Airwaves FM responded to an emergency call out at Levi’s, Bullring to make safe failed glazing unit on the shop front.
Location
Birmingham City Centre
Duration
June 2024 - 2 night shifts
Value
£27,000.00
Levi’s, Bullring - Glazing Removal
Glazing removal at Levi’s store, Bullring Birmingham
Airwaves FM responded to an emergency call out at Levi’s, Bullring to make safe failed
glazing unit on the shop front. Due to store opening hours, an Out of Hours team was
deployed that Sunday evening to mitigate further risk to the shopping centre and its
customers.
The team erected an 8m aluminium scaffold tower and installed protective laminate film to the entire glazing unit.
A return visit was scheduled to remove the glazing unit. An exclusion zone was built with all protective hoarding and flooring installed. The main shop signage was isolated and
removed using scissor lift.
The glazing unit was removed using a BG 250 articulated spider crane with 635kg vacuum
lifter attachment. On removal, a clear screen was installed allowing the store to continue
trading the following day.